- Safety Beach, Victoria, Australia
Hidden Harbour Marina Extension
A 102-berth marina extension designed to expand an existing waterfront development. The project focused on increasing capacity while maintaining consistency with the original marina infrastructure and enhancing overall usability for boat owners.

Design & Construction
The extension utilised modular concrete pontoons integrated with the existing marina layout. The system incorporated pile guides, service infrastructure, and flexible configuration to maximise berth density and accommodate various vessel sizes.
Outcome
Successfully expanded marina capacity while maintaining operational continuity. The project delivered a cohesive and high-quality extension that improved asset value and provided reliable, low-maintenance infrastructure for long-term use.
Key Features
System type
Multi-berth marina extension
Berth capacity
102 berths
Water depth
Approx. 2.5–4.5m
Accessories
Service pedestals, cleats, pile guides
Client
Hidden Harbour Marina Pty Ltd
Completion
Completed