Pier 35 Dry Stack Facility
A major dry stack development located at Pier 35, designed to accommodate approximately 260 vessels. The facility forms part of a broader marina and waterfront activation strategy along Melbourne’s Yarra River.

Design & Construction
The structure incorporates a multi-level rack system with provision for future expansion. Designed for urban conditions, the system balances storage density with operational efficiency and visual integration into the surrounding precinct.
Outcome
Delivered a scalable dry stack solution that maximises land use and supports growing boating demand. The facility provides long-term flexibility and strong commercial performance.
Key Features
System type
Enclosed multi-level dry stack building
Berth capacity
Approx. 260 vessels
Accessories
Gantry/forklift systems, storage racks, service zones
Client
Pier 35 Development
Completion
Completed